THE PROJECT COMPRISED OF THE FULL REFURBISHMENT OF AN EXISTING 44 BEDROOM 4* HOTEL INCLUDING THE GROUND FLOOR RECEPTION, BAR, RESTAURANT, GUEST LOUNGE AND MEETING ROOM AREAS. THE PROJECT WAS A FAST TRACK PROJECT AND COMPLETED WITHIN A PLANNED FOUR MONTH WINTER SHUTDOWN PERIOD OF THE HOTEL
The existing 44 bedrooms were remodelled and all fully refurbished with the introduction of new high quality decorative wall, floor and ceiling finishes and replacement of sanitary ware and ceramic tiling to ensuite bathroom areas. The refurbishment scheme included improvements and new finishes to the existing corridor and staircase areas
To the ground floor, refurbishment of the reception, bar, restaurant, guest lounge and meeting room areas also formed part of the scheme
Key features of the project were:-
- Fast track project undertaken during planned Hotel closure period
- High quality finishes, joinery and sanitary ware installed to meet 4* standards
- Project included refurbishment to the Restaurant and Bar area
- Unique seafront promenade location