60 Bedroom Premier Inn Hotel, Felixstowe, Suffolk

THE PROJECT COMPRISED OF THE CONSTRUCTION OF A THREE STOREY 60 BEDROOM PREMIER INN HOTEL INCLUDING A WHITBREAD ‘THYME’ RESTAURANT FACILITY.

The accommodation within the new hotel comprised of 60 ensuite bedrooms, ‘Thyme’ restaurant with kitchen and WC’s, lift, roof-top plant enclosure, stair core, external fire escape, corridors, laundry rooms and staff areas.

The building was constructed using CFA piles, a steel frame ground floor area and steel transfer deck with a two storey timber frame structure above. The ground floor area contained the ‘Thyme’ restaurant along with bedroom accommodation, the upper floors were solely bedroom and back of house areas. The external envelope of the building was finished with brickwork and aluminium windows. External works comprised of entrance ramp and steps and a large car park to the rear.

Key features of the project were:

  • Piled foundation solution
  • Steelwork ground floor transfer structure
  • Two storey timber frame structure
  • Formation of a restaurant facility
  • 60 Bedroom Premier Inn Hotel, Felixstowe, Suffolk
  • 60 Bedroom Premier Inn Hotel, Felixstowe, Suffolk
Client:
Whitbread Group Plc
Duration:
34
Completion Date:
December 2015

Want to know more

If you are interested in how we can work with you please do get in touch.
owl@barnesconstruction.co.uk

Contact Us

6 Bermuda Road
Ransomes Europark
Ipswich
Suffolk
IP3 9RU

Twitter

Accreditations

NHBC Logo CHAS Logo CIOB Logo Exor Logo Construction Online Logo NFB Logo BSI Logo TFG Logo
Copyright © 2017 - 2018 Barnes Construction   |   All Rights Reserved   |   Web design agency - Integrated Ideas